AbelHeader
AbelHome AboutUs
Products Literature AlliancesNLinks Kingdom Drilling Contact
 
   
AbelLogo Products & Services

Products

 
 

HPSN™ Tool

AbelPic
Services

 
ALCS™ - Abel LMRP Capping System - Subsea Intervention for Deepwater Blowout Incidents utilizing rig LMRP
  • Rapid and effective means to convert LMRP to capping ready device
  • Can intervene in 2 to 3 days
  • Lowest cost system in the market
ACS™ - Abel Capping System - Subsea Intervention for Deepwater Blowout Incidents utilizing rig in stand-alone configuration.


AbelPic

Engineering and Operational Audits
  • Pre-planning, Surveys and Audits of Drilling Plans
  • Planning and Engineering of Drilling Operations
  • Drilling Workover and Completion Operations
  • Risk assessments for insurance purposes
  • Litigation Support

AbelPic
Drilling Optimization Planning and Implementation
  • HTHP (High Temperature High Pressure) exploration projects
  • Development wells (infield drilling, gas and oil prospects)
  • Toxic gas (H2S, CO2, etc.) handling

Well Control Services
  • Risk assessments for well control events
  • Blowout Contingency Planning – Relief Well, Capping Plans, Snubbing Operations, High Risk Well Operations
  • Dynamic Multi-phase Calculations using Dyn-X®, OLGA ® and/or Drillbench®
  • Relief Well Planning and Supervision
  • Pump to Kill Plans
  • Well Capping Operations through business alliances
  • Project Management for Out-of-Control Well Control Events
  • Freezing (multiple strings, pressures up to 8700 psi)

Blowout Contingency Planning
  • Site Specific
  • Organizational
  • Relief Wells
  • Capping Operations 

 
Well Control Project Management
  • Blowout Control Task Force (guidelines)
  • Critical Path Methods (CPM)
  • Incident Command Structure
  • Cost Compliance and Contract Management

Relief Well Services
  • Project Management
  • Trajectory Strategy
  • Intercept Methodology
  • Communication Tactics
  • Pumping Stratagem
  • Abandonment/Recovery

AbelPic
Prevention Services
  • 3-Level Response Guidelines
  • Interventions at Level 2 (prevents the blowout)
  • Operational Plans for Prevention of Well Control
  • Drills and Exercises for Well Control Events

Risk Management Services
  • Risk Identification
  • Assessment of Risk
  • Blowout Impacts
  • Data Base Studies
  • Probability Studies
  • Audit and Reviews

Well Flow Modeling
  • Provide Accurate Modeling through the use of: Drillbench® and OLGA ®
  • Steady State and Dynamic Modeling of Drilling Hydraulics
  • Risk Evaluation through Dynamic Well Control Modelling. Proper risk evaluation performed with a dynamic multiphase well control model is increasingly needed as well conditions become more extreme.
  • Expert Application of the Program to achieve successful drilling of challenging wells by having an in-depth understanding of the hydraulics during all phases of the operation.

Well Site Supervision of Drilling, Testing and Completion Operations
  • HTHP Exploration and Development Projects
  • Onshore and offshore type operations

Underbalanced Drilling (UBD) and Extreme Underbalanced Drilling (eUBD) Operations
  • Feasibility studies (engineering and operations)
  • Equipment specifications and design for UBD and eUBD Operations
  • Supervision of UBD and eUBD Operations
  • Project management of UBD and eUBD Operations in the Field
  • UBD equipment through multiple business alliances
  • Proximity Logging
  • eUBD Brochure

OPERATIONAL PARAMETERS for the ABEL UBDTechnique can be implemented at any wellhead pressure or type of wellbore fluids. Our operational capabilities are:

  • Wellhead pressures up to 12,500 ps
  • Corrosive and toxic effluents (H2S, CO2, etc.
  • Hi-temp Hi-pressure downhole conditions
  • Zero discharge criteria
  • High volume flow rates (oil, gas or water)

Snubbing Operations
  • Planning and design of operations and equipment
  • Supplier of snubbing equipment through business alliances Equipment for Pressure Control
  • High Pressure Shooting Nipple
  • Rotating BOP equipment
  • Choke manifolds
  • High pressure and low pressure 3-phase separators

AbelPic
Special Projects
  • Equipment design for quick rig up for logging operations
  • Special snubbing equipment for high pressure operations



Civil & Mechanical Engineering
  • Finite Element Analysis (FEA)
  • Structural Designs
  • Steel, Concrete, Dirt Works
  • Temp Production Facilities
  • Compression plans for temp. production
  • Detail & CAD Drawings

Copyright©  Abel Engineering LLP 2012